Latest News & Events

Three tools to ease the rough life

An array of maintenance equipment and specialised tools is needed to meet expectations for course conditions and playability from today’s golfers. The rough – including intermediate, primary, secondary and transitional areas – is no exception. These areas comprise the largest span of turf to maintain....

February 13, 2020
Top 3 Considerations When Buying a Slurry Applicator

Dribble bar, band spreader, trailing hose, trailing shoe, disc injector or shallow injection? Whatever name you read or see, they all refer to low emission spreading systems under evolving environmental regulations. The variety of systems available, and the number of options and features, can be...

January 14, 2020
MAJOR Presents New Retro-fit Slurry Spreaders at LAMMA 2020

Major Equipment’s new low emission Dribble Bar and Trailing Shoe applicators offer a solution to the growing challenges of tighter regulations while maximising the benefit of slurry. The MAJOR applicators are designed to apply slurry to the soil surface as accurately as possible while minimising...

December 24, 2019
The Grass & Slurry Machinery Specialists | Agricultural - Professional Groundscare - Industrial
Top
Major 3500 Tandem Tanker
Major 3500 Tandem Tanker

AD Plant Waste Management – 3500 Tandem Axle AD Tanker

Client: Barfoot Farms, West Sussex, UK.

Farmed area:  2000ha (5000acres)
AD Plant: 1.1MW twin-tank MT Energie system fed predominatly with veg. packhouse waste running 2 x 20-cylinder 1500hp engines

Often the biggest headache for anyone running a biogas plant is in dealing with the digestate. With over 50million litres of liquid to deal with each year from a 2.3MW digester, Barfoot Farms in West Sussex has a very professional system in place to handle its slurry and needed reliable tankers to back up its operations.  Growing some 5000acres of vegetables, Barfoots were keen to make best use of the nutrient value of the digestate.

The work is handled by two Major 3500 gallon tankers with a 5.2m disc injector and a 10m Vogelsang dribble bar.  The dribble bar linkage on Major tankers is connected directly to the chassis, which puts less strain on the machine so it lasts longer. The tanker has a steering rear axle. It makes the tanker much more manoeuvrable and on concrete there’s no scuffing of tyres. Filling is by a Battioni vacuum pump with a drop down fill-arm. It makes loading a clean, two to three minute job.

Description

Design Details

  • 15,900 litre/ 3500 gallon tankers on twin axles with a steering axle
  • 80cm/30” back door
  • Full galvanised finish
  • 15cm/6” Auto filler for quick and simple filling
  • LED lights and beacon
  • 13500 litre hydraulic pump
  • 650/50R225N Nokian tyres

Video



Testimonials


With over 50million litres of liquid to deal with each year from a 2.3MW digester, we need to be very efficient on how we handle our slurry. 90% of our land is away from the plant - some up to 10miles away. It was clea ...
Read More

Grant Lumsden, Manager, Barfoot Farms, UK

In order to provide a highly reliable and efficient service to our customers, we researched the bulk tanker market to establish which machines would best suit a high output capability. We spoke to Major and did the deal ...
Read More

Owyn Nelmes, OJ & DJ Nelmes, Dorchester, UK
Category: